Objective. Student will complete accurate as-built markups, assist the supervising installer during at least one AHJ inspection, and conduct a professional post-installation walk-through with a customer, demonstrating clear communication of system operation and safety.
This lesson, its worked examples and its practice questions has not yet been verified by a licensed professional engineer or master tradesperson or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.
VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.
As a PV installer, your job does not end when the last module is bolted down. Three critical tasks follow every installation: creating accurate as-built documentation, supporting the Authority Having Jurisdiction (AHJ) inspection, and walking the customer through their new system. Each task protects the homeowner, the installing company, and your professional reputation.
The permit-set drawings submitted to the AHJ describe the planned installation. Field conditions—an unexpected rafter location, a conduit rerouted around an obstacle, a combiner box moved six feet—mean the finished system rarely matches the plans exactly. As-built markups record what was actually built.
Use red-line markup pens on a printed copy of the approved permit drawings, or use your employer's digital markup tool on a tablet. Work through every sheet systematically:
Submit your completed markup to the supervising installer for review before the inspection. Errors caught in-house are far less costly than correction orders issued by an inspector. Never submit drawings you have not personally verified against the physical installation.
The AHJ inspector's job is to verify that the installation complies with the adopted electrical code, the fire code, and the approved permit drawings. Your job during the inspection is to support the supervising installer professionally.
Before the inspector arrives:
During the inspection:
After the inspection:
The customer walk-through is your final quality gate and often your last direct contact with the homeowner. A confident, clear walk-through builds trust and reduces service calls.
Inverter display operation: Show the customer the inverter's status lights or LCD display. Explain what a normal operating state looks like (producing power, grid connected) versus a fault or sleep state. Describe how output varies with sunlight and temperature—this prevents alarm calls on cloudy days.
Monitoring app setup: Walk the customer through downloading the app and logging in to their monitoring account on their own device before you leave. Show them where to find today's production, historical data, and any alert notifications. A customer who can read their own data is an informed, satisfied customer.
Rapid-shutdown switch location: Walk the customer to the rapid-shutdown initiating device and explain its purpose: in an emergency, first responders or the homeowner can de-energize the roof conductors from a safe location. Stress that they should never cover or disable it.
Service contacts: Provide written contact information for warranty service, monitoring support, and the utility. Explain what situations warrant each call. Make clear that DC conductors on the roof remain energized whenever sunlight hits the modules—no homeowner should touch array wiring.
Document everything: Use the customer communication checklist to confirm each topic was covered. Have the customer sign it, keep a copy in the project folder, and offer a copy to the customer. Document any questions the customer asks and your answers; unusual questions may signal a design or installation issue worth reporting.
Even during documentation and inspection activities, stay alert to live electrical hazards. The system may be energized on the DC side any time the array is exposed to light. Wear appropriate PPE near open electrical enclosures. Follow your employer's lockout/tagout (LOTO) procedures any time you need to open a live enclosure for the inspector. Never bypass LOTO to speed up an inspection.
Answer each question, then check it. Nothing is recorded; this is your own practice.
A free tech program — complimentary, as our commitment to get America working. Help us build VoTechWorks. Tell us what works, what doesn’t, and what you want to learn.
Does the school offer financial aid?
No. We don’t offer financial aid because we’re free. No, really: completely free.
Do you offer industry certification?
No. We are not certified yet, so we can’t offer that to students. What we do offer is knowledge and understanding of a trade.
Enroll first in the trade you’re interested in. You get your key, your program opens, and you begin studying.
Enroll free →