Objective. Students extract dimensions, weld type, groove geometry, and material specification from a set of multi-view orthographic shipbuilding drawings and annotate a blank reference line with the correct AWS A2.4 weld symbol for a specified joint, achieving at least 80% on a drawing-reading exercise.
Every piece of steel that goes into a vessel begins as a line on a drawing. Shipfitters, welders, and marine fabricators who cannot read those lines accurately produce parts that do not fit, welds that fail inspection, and rework that costs time and money. This lesson teaches you to extract reliable information from shipbuilding structural drawings, decode AWS A2.4 weld symbols, and act correctly on a written work order.
Shipbuilding drawings use standard orthographic projection: the part is shown from the front (body plan), side (profile), and top (half-breadth plan). Each view shares dimensions with its neighbors, so a width shown in the front view matches the width shown in the top view. When you pick up a structural drawing, orient yourself first:
1. Find the title block. It lists the vessel name or hull number, drawing number, revision letter, scale, material specification, and the approval signatures. Never begin work from a drawing that lacks an approved signature or that has been superseded by a later revision.
2. Read the bill of materials (BOM). The BOM is a table, usually in the upper-right corner, that lists every part number, its description, the material specification (for example, ASTM A131 Grade A mild shipbuilding steel), quantity, and sometimes the unit weight. Match each part number to its balloon callout on the drawing before you measure anything.
3. Check the scale and the notes block. General notes override individual callouts only where stated. Tolerances, surface preparation requirements, and weld procedure references often live in the notes block.
4. Measure from datelines, not from the edge of the paper. Ship structure is dimensioned from the vessel's centerline, the baseline (bottom of keel), and frame stations. Know which reference plane each dimension originates from.
A transverse web frame is a vertical ring of plate and stiffeners that runs across the beam of the ship at a specific frame station. The drawing will show the web plate, face flat (flange), bracket connections at the shell and tank top, and all cutouts for pipe penetrations and lightening holes. Typical items to record on your answer sheet include:
If a dimension is marked with a revision cloud—a freehand cloudy outline around the change—that dimension has been altered since the previous revision. Always note the current revision letter and compare it to the revision block to confirm you are working from the latest issue.
AWS A2.4 is the American Welding Society standard that defines a universal shorthand for weld requirements. Every weld symbol is built on a reference line drawn horizontally, with an arrow pointing to the joint. Information placed below the reference line applies to the arrow side of the joint; information placed above applies to the other side.
Key elements of a complete weld symbol:
When you decode a symbol, work systematically: identify the weld type, then read size, then length/pitch, then contour, then any tail reference.
A work order is the official authorization to perform a specific task. In a shipyard, it typically includes the drawing number and revision, a plain-language description of the work, material callouts, the applicable weld procedure specification (WPS), and any hold points—stages where an inspector must examine and sign off the work before it continues. You may not weld over a hold point without written inspector approval.
When a drawing carries a revision cloud, your first task is to find what changed. Compare the current revision letter in the title block to the revision history block; the description of the change is listed there. Record the old value, the new value, and the affected part or dimension. Proceeding with an outdated dimension is a recordable quality nonconformance and can require cutting out completed welds.
Drawing review is a low-hazard activity, but the decisions made during it drive real hazards later. Before you begin any fitting or welding task:
Answer each question, then check it. Nothing is recorded; this is your own practice.
A free tech program — complimentary, as our commitment to get America working. Help us build VoTechWorks. Tell us what works, what doesn’t, and what you want to learn.
Does the school offer financial aid?
No. We don’t offer financial aid because we’re free. No, really: completely free.
Do you offer industry certification?
No. We are not certified yet, so we can’t offer that to students. What we do offer is knowledge and understanding of a trade.
Enroll first in the trade you’re interested in. You get your key, your program opens, and you begin studying.
Enroll free →