Objective. Students will fabricate and install a complete conduit system—including at least two stub-ups, one three-bend saddle, one offset, and all required junction and device boxes—on the program's full-scale wall-frame mockup, achieving dimensional accuracy within ±1/4 inch and full NEC support-spacing compliance.
This lab brings together every layout and bending skill you have developed and applies them to a full-scale wall-frame mockup. By the end of the session you will have a complete conduit system—correctly spaced, accurately bent, properly filled, and ready for a simulated municipal rough-in inspection.
Before picking up a tool, put on your PPE: safety glasses, work gloves, and hard hat. EMT cut ends are razor-sharp; always ream every cut end with a conduit reamer before threading wires or touching the edge with bare skin. When using a fish tape, keep hands clear of the reel and never feed tape toward an energized circuit. Even though the mockup is de-energized, treat the megohmmeter leads as you would a live meter—the instrument applies a test voltage that can startle or injure. Inspect all hand tools before use; a bent bender shoe or cracked handle changes your bend geometry and can slip.
For this lab the mockup is de-energized, so lockout/tagout is not required—but your instructor will review the procedure because it applies to every real rough-in job where existing circuits may be live nearby.
Accurate layout is the foundation of clean rough-in work. Start by snapping a chalk line at the standard mounting height for device boxes (typically measured to the center of the box or to the bottom of the box, depending on local practice and your approved routing plan). Use a tape measure and torpedo level to position each box so its face will land flush with the finished wall surface once drywall is applied—account for the drywall thickness in your setback. Secure metallic outlet, switch, and junction boxes to studs using the manufacturer's approved fasteners; a box that rocks under hand pressure will fail inspection.
Before moving on, complete your box-fill calculation for every box. The NEC specifies the volume allowance for each conductor, device, clamp, and equipment-grounding conductor entering the box. If your calculated fill exceeds the box's listed cubic-inch capacity, you must upsize the box or reduce conductors. Record every calculation and call for instructor sign-off before bending conduit.
All bends must be fabricated with the correct hand bender shoe for the conduit size—use the 1/2-inch shoe for 1/2-inch EMT and the 3/4-inch shoe for 3/4-inch EMT. Mix-ups crush the conduit wall and create a fail.
Stub-up: Place the arrow mark on the bender at the desired height line on the conduit and apply smooth, steady foot pressure until you reach 90°. Verify the stub height with a tape measure.
Offset: An offset uses two equal bends to clear an obstruction. Determine the offset depth and select the matching bend angle (common choices are 22°, 30°, or 45°). The shrink per inch of offset depth changes with angle—record the shrink multiplier for your chosen angle on your bend log sheet and subtract it from your first-mark measurement. Both bends must be in the same plane; use the conduit level to check.
Three-bend saddle: A three-bend saddle clears a round or rectangular obstacle. Mark the center of the obstacle on the conduit. The center bend is 45°; the two outer bends are each 22½°. The spacing between marks depends on the obstacle height—your NCCER module provides the formula. All three bends must align in one plane.
Back-to-back (or back-to-back 90°): Two stub-ups facing opposite directions; the distance between the arrows equals the center-to-center span you need.
Log every arrow mark, reference mark, and gain value before and after each bend. The instructor will measure every finished bend. Any bend outside the ±1/4-inch tolerance must be re-fabricated—kinked or flattened conduit is never acceptable.
Secure conduit to the structure with approved straps or hangers. The NEC requires support within a specified distance of every box or fitting and at regular intervals along the run—verify the maximum support spacing for EMT in your NEC codebook and mark your strap locations before drilling. Conduit that sags between supports fails inspection.
Before pulling wire, verify conduit fill. The NEC limits the total cross-sectional area of conductors to a percentage of the conduit's interior area: 53% for one conductor, 31% for two conductors, and 40% for three or more. Use the wire and conduit tables in the NEC Annex to confirm compliance.
Feed your fish tape through the conduit, attach conductors, and pull smoothly—no jerking. Maintain correct color coding: black or red for ungrounded (hot) conductors, white or gray for grounded (neutral), and green or bare copper for equipment grounding conductors. Strip conductors to the correct length for each termination (device manufacturers mark the strip gauge on the back of the device). Use approved connectors and locknuts to secure conduit to boxes; hand-tighten, then give a quarter turn with pliers.
Install all device and junction box covers before testing.
After termination, perform two tests on every circuit:
1. Continuity test: Confirms that the circuit path is complete with no open connections.
2. Megger (insulation resistance) test: The megohmmeter applies a DC test voltage between conductors and between conductors and ground. A reading of at least 1 MΩ is required; a lower reading indicates damaged insulation or a fault. Log every reading on the project test-record form.
Any circuit that fails either test must be de-terminated, the fault found, corrected, and the test repeated.
Your instructor uses a pass/fail checklist modeled on a real municipal rough-in inspection. Every item must pass: box heights within ±1/4 inch, conduit support spacing within NEC limits, conduit fill within allowed percentage, correct conductor color coding, continuity confirmed, and insulation resistance ≥1 MΩ. A single failure means you correct the item and call for re-inspection—just as you would on a real job site.
Answer each question, then check it. Nothing is recorded; this is your own practice.
A free tech program — complimentary, as our commitment to get America working. Help us build VoTechWorks. Tell us what works, what doesn’t, and what you want to learn.
Does the school offer financial aid?
No. We don’t offer financial aid because we’re free. No, really: completely free.
Do you offer industry certification?
No. We are not certified yet, so we can’t offer that to students. What we do offer is knowledge and understanding of a trade.
Enroll first in the trade you’re interested in. You get your key, your program opens, and you begin studying.
Enroll free →