Objective. Students will complete a pre-fumigation preparation checklist—including occupant notification, food and drug removal or bagging, utility isolation, and tarpaulin inspection—following label requirements and state regulatory standards.
This lesson, its worked examples and its practice questions has not yet been verified by a licensed professional in the field or by a certification or approval body. It is a study draft and may contain errors. Do not use it as instructions for work on a job site or on live equipment. Always follow your instructor, your supervising professional, and current official references and regulations.
VoTechWorks program approval and accreditation are still in progress. Credentials are issued only by the certifying bodies named in each program, after their own exams.
Structural fumigation uses penetrating gas fumigants—most commonly sulfuryl fluoride—to eliminate wood-destroying insects and other pests throughout an entire building. Because these gases are invisible, odorless in their pure form, and highly toxic, every mistake made before the tarp goes down can become a life-safety emergency. Pre-fumigation preparation is the phase where you eliminate those mistakes. It is not paperwork for its own sake: it is the professional and legal foundation on which every safe, effective fumigation job rests.
State pesticide law and the fumigant label (which is a legal document under FIFRA) both impose specific pre-fumigation duties. Failing to follow them can result in license revocation, criminal liability, and—most seriously—injury or death to occupants, neighbors, or your crew.
Before any fumigant is released, the lead technician must walk every accessible area of the structure with a checklist. The goals of the walk-through are:
Complete your checklist in writing during the walk-through. A checklist completed from memory after the fact is not a reliable safety tool.
State regulations and the fumigant label require that occupants receive notification before they vacate. Notification is not optional and not casual. You must:
1. Deliver written materials that include the fumigant name, active ingredient, the warning sign that will be posted, and the estimated re-entry date and time.
2. Verbally explain what items must be removed or bagged, where occupants can stay, and how they will be contacted when the structure is cleared for re-entry.
3. Post EPA-required warning signs at all entry points before fumigation begins. These signs must remain posted until a certified applicator has confirmed the structure is safe and cleared the signs.
4. Document the notification on the fumigation order form with the date, time, and signature or acknowledgment of the occupant or their representative.
Be prepared to answer occupant questions clearly and accurately. Common questions concern the safety of food left inside, what happens to houseplants, and when they can return. Your answers must match label language and your company's procedures.
Fumigant gases penetrate most common packaging materials. Items that are not in their original airtight, sealed containers must be removed from the structure or placed in gas-impermeable bags before fumigation.
Gas-impermeable bags (often referred to by the trade name Nylofume, though equivalent products exist) are the industry standard. These bags are made from a multilayer film that fumigant gas cannot penetrate at the concentrations and exposure times used in structural fumigation. Proper use requires:
Items that must be bagged or removed typically include: any food or feed not in original unopened airtight metal or glass containers, medicines and vitamins, tobacco products, and items specified on the label. Check the current label for the fumigant being used, because requirements can differ between products.
Items that must be removed entirely include living things (people, pets, houseplants, fish) and items the label specifically prohibits bagging.
The tarpaulin (tarp) traps fumigant gas inside the structure. A compromised tarp is both an efficacy failure and a safety hazard to neighbors and passers-by. Before use, inspect tarps for:
Damaged tarps must be repaired with compatible patching tape or taken out of service. Never assume a tarp that "worked last time" is still serviceable without inspection.
During pre-fumigation preparation you are not yet exposed to fumigant, but you must have the correct PPE staged and ready before gas introduction begins. Self-contained breathing apparatus (SCBA) or supplied-air respirators required for gas introduction must be inspected and fit-tested. Review your company's emergency action plan and know the location of the nearest exit at all times. Never enter a tented structure after gas introduction without appropriate respiratory protection and a cleared gas reading.
Every item on the pre-fumigation checklist is there because a real incident revealed the need for it. Treat every line as mandatory. State regulations and the label set the minimum standard; your checklist must meet or exceed that standard. All 12 mandatory items must be addressed before fumigation proceeds. Safety-critical items—occupant clearance, gas shutoff, warning sign posting—allow no partial credit.
Answer each question, then check it. Nothing is recorded; this is your own practice.
A free tech program — complimentary, as our commitment to get America working. Help us build VoTechWorks. Tell us what works, what doesn’t, and what you want to learn.
Does the school offer financial aid?
No. We don’t offer financial aid because we’re free. No, really: completely free.
Do you offer industry certification?
No. We are not certified yet, so we can’t offer that to students. What we do offer is knowledge and understanding of a trade.
Enroll first in the trade you’re interested in. You get your key, your program opens, and you begin studying.
Enroll free →